Skip to content

A. Pöttinger spol. s r.o. Vodňany – Stage VII - Halls 5 and 6

Facts and Figures
Company PORR a.s.
Principal A. Pöttinger spol. s r.o.
Location Vodňany - Czech Republic
Type Industrial construction
Runtime 11.2015 - 03.2017

A successful collaboration continued with the expansion of two assembly halls.

PORR constructed two additional assembly halls at the Vodňany site of agricultural machinery manufacturer Pöttinger. The new buildings, Halls 5 and 6, house the complex assembly of ploughs, disc cultivators and seeders, among other tasks.

The load-bearing construction of the halls consists of steel and concrete. The lightweight outer covering layer comprises a heat retention system. The concrete flooring was coated with a cover layer of artificial resin concrete.

Both halls serve to house metal-cutting machinery along with assembly and logistics. This increases the chip machining capacity of the company. The completion of these buildings marked the conclusion of expansion works at the Pöttinger plant in Vodňany.