-
Order backlog climbs to EUR 8.2 bn Strong rise in production output (+8.7%) and revenue (+11.9%) Solid EBT margin in line with expectations Positive outlook for 2023
Vienna, 28.02.2023 –…
-
230130 Press Release Motol EN 230130 Press Release Motol EN
New Simulation Centre at the University Hospital in Motol PORR has been awarded another public contract using the Design & Build method…
-
Prague, 30 01.2023 - PORR won the public tender for the construction of the building of the Intensive Medicine Simulation Centre at the Motol University Hospital in Prague. The contract was awarded…
-
Solid order backlog of EUR 7,863m Production output with a plus of 9.4% Increase in EBT to EUR 57.5m Earnings forecast 2022 over EUR 100.0m Optimistic outlook for 2023 …
-
221128 Q3 2022 FINAL en 221128 Q3 2022 FINAL en
Press Release PORR closes strong 3rd quarter • • • • • Solid order backlog of EUR 7,863m Production output with a plus of 9.4% Increase in EBT to…
-
Back to media library
Before reconstruction
Milling
Strakonická ramp demolition
Ledge removal
Rebar and works inside the bridge
Concreting
Night shift
Bridge conclusion
Asphalt…